Larrywaug Bridge on Interlaken Road CLOSING July 13, 2020

Larrywaug Bridge on Interlaken Road CLOSING July 13, 2020

The replacement of the Larrywaug Bridge on Interlaken Road (Route 183 near the Berkshire Botanical Gardens) will take place this summer. Because of the severe deficiencies outlined in the annual bridge inspection reports provided by the MASSDOT, as well as the bridge’s overall geometry, the structural engineer has determined that there is no safe way to maintain partial traffic during the replacement, so the bridge will have to be closed beginning July 13th. A detour route has been established with signs and message boards posted to guide motorists (please see attached detour route). It is expected that this project will be completed in May 2021. We apologize for any disruptions. Thank you, Len Tisdale, Stockbridge Highway Superintendent

Detour Map